Broker Terbaik di dunia

Tampilkan postingan dengan label Fruit reception station. Tampilkan semua postingan
Tampilkan postingan dengan label Fruit reception station. Tampilkan semua postingan

Selasa, 31 Desember 2013

Prosedur Pengisian TBS di loading ramp di pabrik kelapa sawit

Prosedur pengisian TBS di stasiun loading Ramp di pabrik kelapa sawit


  •    Pengisian TBS ke loading ramp harus diawasi dengan hati-hati, ‘ramp hoppers’  harus diisi dari ujung ke ujung melalui pengoperasian pabrik.
  •   Buah yang tercecer dan tumpahan harus segera dibersihkan setelah masing-  
           masing kendaraan bongkar dan  kendaraan lain dilarang menabrak buah yang 
           tercecer.
  •   Kendaraan dilarang masuk ke area bongkar tanpa pengawasan atau supervise dari personil yang ditunjuk. Apabila ditemukan supir pengangkutan TBS membongkar muatannya tidak ditempat yang telah ditentukkan, maka kepadanya akan diberikan sanksi yang tegas.

Prosedur penimbangan buah di pabrik kelapa sawit

Prosedur penimbangan buah


1.         Sopir Truck melaporkan surat pengantar (SP) TBS (FRM-MIL-001) di Pos I, selanjutnya sopir truck arahkan mobil ke areal parkir.
2.         Sopir menyerahkan surat pengantar TBS ke Posko Security (Posko Mill)
3.         Petugas security menunggu informasi dari petugas sortasi untuk mengatur masuknya mobil truck TBS dari TBS luar.
4.         Atas informasi dari petugas sortasi, petugas security memasukkan mobil truck TBS untuk ditimbang, dan petugas weighbridge menimbang berat brutto mobil truck sesuai dengan DO (delivery order), plat mobil dari SPB terlampir.
5.         Petugas weighbridge memberikan formulir timbangan (FRM-MIL-002) yang bertuliskan Nama supplier, No plat mobil, dan berat brutto, untuk diberikan kepada petugas sortasi.

Jumat, 19 Agustus 2011

Loading Ramp

Loading Ramp is a temporary dump and removal lorries TBS into stew. TBS was poured on each bulkhead set of doors to another door with stuffing according to the capacity.
Charging should not be too full because the filling is too full can lead to:
- The door and the retaining plate bent TBS.
- TBS and berondolan can fall down.
- Difficulty to lower FFB into the lorry.
The things mentioned above can lead to production losses (add to losses, increased FFA) and increased hours of factory work.
In the oil palm plant usually has 2 Loading Ramp consists of two lines (A and B) where his every line with a capacity of 220 tons of FFB or 22 doors with a capacity of ± 10 tons FFB / door using a hydraulic-type system Vertical Sliding Gate ramp with a slope of 26 o .
Floor loading ramp is made of iron composition profile "T" are respectively arranged within 10 mm which aims to form a lattice so that a smooth dirt carried TBS did not enter further into the lorry and debris will fall to the floor under the ramp and then garbage will be collected and disposed out of the factory.
Kenapa Anda tidak Lulus PNS & BUMN??

Lihat disini apa yang kurang dari Anda


Rahasia Menjadi Jutawan

Terbukti 100 % Sudah banyak menghasilkan orang yang menjadi Jutawan bahkan milyaran dari tahun ke tahun...!!!!



Cuma Daftar langsg Dapat Rp.50ribu Gratis...!!!

mendaftar Gratis di ViralGen anda Langsung Diberi Bonus Rp.50.000 ayo buruan ...!!!



Toko Online Murah

Disini menjual Berbagai produk yang sangat murah untuk semua kalangan



Lowongan Kerja BUMN CPNS 2015/2016...!!

Semua info Lowongan Kerja BUMN dan CPNS 2015/2016 ada disini


Rahasia Lulus Masuk CPNS & BUMN Tanpa uang Sepeser pun ???

Baca pengalaman para PNS dan BUMN yang sudah lulus...
Anda pun pasti bisa Lulus.....!!!!Klik disini